Hi everyone, i currently have some landscapers at my house who are creating a wall to fill in grass to level out the backyard so we can put a swing back there. The landscapers miscalculated how much material was needed to level the grass with the patio. Right now we are at 6 inch slope and it’s another $4000 all in to get the slope to roughly 1 inch slope (for draining)
It seems 6 inches would be fine for swing/play set as we could find ways prop the set to be level (unless I’m underestimating that).
Is there anything else i should consider here? Should I just go ahead with the $4000 to get it more level or will 6 inches be hardly noticeable and not worth it?
I’m fine with the patio on the top left being a little higher than the rest.
The pic is where it’s at right now with 6 inches ( I know the pic isn’t helpful)
Any help is greatly appreciated