Menu

Post image 1
Post image 2
Post image 3
Post image 4
Post image 5
1 / 5
0

Mumbai-Ahmedabad bullet train project: How NHSRCL is constructing the Sabarmati River bridge

The Indian Express·Anish Mondal·about 1 month ago
#bx76bUjv
Reading 0:00
15s threshold

Mumbai Ahmedabad bullet train project has gained pace with NHSRCL accelerating construction of the Sabarmati River bridge in Ahmedabad. (Image: NHSRCL) Mumbai-Ahmedabad bullet train latest news: The National High-Speed Rail Corporation Limited (NHSRCL) is progressing on the construction of the Sabarmati River bridge as part of the Mumbai-Ahmedabad bullet train project. This 480-metre-long bridge is being built alongside the Western Railway’s Ahmedabad-Delhi main line. The 508-km-long Mumbai - Ahmedabad bullet train project is passing through Gujarat, Maharashtra and Union Territory of Dadra & Nagar Haveli. Sabarmati River Bridge on MAHSR corridor According to NHSRCL, the construction of a 36-meter-tall bridge equivalent to a 12-storey building (approx. 118 feet) over the Sabarmati River in Amdavad. It is strategically located between the Sabarmati and Ahmedabad bullet train stations. The bridge lies approximately 1 km from Sabarmati bullet train station and about 4 km from Ahmedabad bullet train station.…

Continue reading — create a free account

Join HashtagPLUS to read full articles, follow hashtags, vote, and join the conversation.

Read More