This is a chip retooling strategy to maximize cost reduction by redesigning the internal architecture of top-tier CPUs from 2025 using the 2+3+3 formula for extended 3-year use. I'll summarize it as simply and clearly as possible: The Cost Reduction and Standard CPU Production Cycle Strategy 2+3+3 (Retooling Version) Retooling Process: Top-tier CPUs from 2025 are redesigned with a new internal architecture based on the 2+3+3 standard to provide high flexibility for future GPU upgrades. This retooling makes the chip highly cost-effective. This technology can be used in the Standard model for up to 3 years (2026, 2027, 2028), significantly reducing the cost of researching new chips each year. Standard Model Upgrade Cycles: 2026 Standard Model: Uses the top-tier 2025 CPU with a modified 2+3+3 internal configuration (3nm manufacturing process). 2027 Standard Model: If prices remain high, continue using the same modified 2025 top-tier CPU to minimize costs.…