Anthropic stacked five compute deals through May 2026: SpaceX Colossus 1, Amazon, Google plus Broadcom, Microsoft Azure, and Fluidstack Combined headline: 10+ gigawatts on paper, 300 MW actually online inside one month Week 1 changes nothing for a solo studio, but 12-month rate-limit economics get rebuilt The Amazon and Google deals do not land until late 2026 and 2027, so the near-term headroom is mostly Colossus 1 Pro, Max, Team, and Enterprise five-hour limits already doubled and peak-hour throttle is gone I keep a small text file with every Anthropic capacity deal I see. As of May 6, 2026 it has five entries. The numbers are a lot bigger than they were last quarter, the timelines vary wildly, and the press headlines are doing that thing where they pile up gigawatts and dollar signs in a way that is impressive and also useless if you are the one trying to plan the next twelve months of a one-person studio. So here is the map I drew for myself.…